Planned preventive maintenance (PPM) explained

In short

PPM, short for planned preventive maintenance, is maintenance done to a schedule so that equipment and buildings do not fail, instead of waiting for them to break. In UK facilities management it includes routine servicing, inspections and statutory checks, scheduled by date, by run hours or by condition.

The FM Shortlist research team

What falls under PPM

Anything you would rather service than repair: boilers, chillers, air handling units, lifts, fire alarms, emergency lighting, water systems, electrical installations, gutters and roofs. Some tasks are simply good routine practice; others are statutory checks whose frequency is set by law or official guidance.

Ways to set a PPM schedule

  • <b>On the calendar</b>: monthly, quarterly, annually.
  • <b>On usage</b>: run hours, cycles or meter readings.
  • <b>On condition</b>: when a sensor reading moves out of range.
  • <b>By law or guidance</b>: such as monthly tests of emergency lighting, or six-monthly thorough examinations of lifts that carry people. Read emergency lighting test rules and LOLER thorough examinations.

About SFG20

Many UK estates use SFG20, a maintenance specification, to set PPM tasks and frequencies. It has no legal force, but it provides a recognised standard for planning and auditing. A number of CAFM systems include the SFG20 library; the preventive maintenance software ranking shows which ones state it.

How PPM supports statutory compliance

A lot of PPM tasks are also the way you meet legal duties: maintaining fire safety equipment, controlling legionella, keeping electrical systems maintained and examining lifting equipment. Our compliance guides give each check, its frequency and whether it comes from law, a British Standard or guidance, and the compliance calendar tool groups them by building type.

Planned versus reactive maintenance

PPM happens before something fails; reactive maintenance repairs it afterwards. Most teams do both, and the split between the two is among the clearest signs of how well an estate is looked after. Read our planned vs reactive guide.

Putting together a PPM schedule

  • <b>Record each asset</b> that needs maintenance, along with its location. This normally lives in a CMMS software or CAFM system asset register.
  • <b>Assign tasks and frequencies</b> to each asset, using SFG20, the manufacturers' instructions and any statutory checks that apply.
  • <b>Choose who carries out each task</b>: your own staff or a contractor.
  • <b>Balance the workload</b> over the year so no single month is overloaded.
  • <b>Log every visit</b>, attaching the certificate or result to the asset.
  • <b>Revisit the schedule</b> after a year: put assets that keep failing on tighter checks, and ease off on those that never fail.

Where the frequencies for PPM come from

Frequencies vary from asset to asset, and their source matters: law sets some, an approved code of practice others, and British Standards or manufacturers the rest. Each of our compliance pages gives the frequency and its source:

AssetGuide
Emergency lightingTesting emergency lighting
Fire alarm systemsTesting fire alarms
Water systemsControlling legionella
Fixed electrical installationsEICR fixed wire testing
Lifts and lifting equipmentLOLER thorough examinations
Gas appliancesGas safety inspections
Air conditioningTM44 air conditioning inspections and F-gas leak checking
Pressure systemsExamining pressure systems

For an office, school, hotel, retail unit or warehouse, the compliance calendar tool brings them together.

Software that states PPM features

For each feature a PPM programme depends on, what every product states in its own documentation.

SoftwarePlanned maintenance (PPM) schedulingSFG20 maintenance libraryCompliance certificates and expiry trackingQR or NFC asset tagsIoT and sensor triggersRating
InfraspeakYesYesYesYesYes4.7 from 178 reviews
PlanonYesYesPartlyYesYes4.3 from 16 reviews
ConcertoYesYesYesYesYes4.5 from 4 reviews
Service Works GlobalYesYesPartlyYesPartly5.0 from 1 review
MaintainXYesNot confirmedPartlyYesYes4.8 from 3,136 reviews
JoblogicYesYesYesYesNot confirmed4.5 from 483 reviews
SnapfixYesNot confirmedYesPartlyYes4.7 from 63 reviews

Taken from each vendor's documentation, with the source for every cell on its review. Not stated means we searched and found nothing.

How to measure a PPM programme

  • <b>Completion rate</b>: the proportion of planned tasks finished on time each month.
  • <b>Overdue statutory checks</b>: none, ideally, with a reason given for any that are.
  • <b>Ratio of planned to reactive work</b>: read planned and reactive maintenance compared.
  • <b>Repeat faults</b>: assets that go on failing in spite of planned visits, which suggests the schedule or the task is wrong.

PPM software

CMMS software and CAFM systems are designed to schedule and record PPM. The preventive maintenance software ranking weights PPM scheduling, certificates, asset tags and sensor triggers, and the HVAC maintenance ranking applies the same approach to heating and cooling plant.

Common questions

What is PPM short for?

Planned preventive maintenance. UK facilities management uses it for statutory checks as well as routine servicing.

Does the law require PPM?

Parts of it, yes: the law requires many systems to be maintained, and sets or guides how often certain checks happen. Other tasks are good practice. For each check, our compliance guides say which applies.

How frequently should PPM happen?

That varies with the asset and the task. Routine servicing frequencies come from SFG20 and manufacturers' instructions; statutory checks have their own, which our compliance pages list.

How does PPM differ from preventive maintenance?

Hardly at all. PPM is the term used in UK facilities; preventive maintenance is more widely used. Each means work planned ahead of failure.

Can you run PPM on paper?

You can, but showing compliance becomes harder as the estate grows. Software holds the schedule, records and certificates together; see the preventive maintenance software ranking.