Planned vs reactive maintenance: how they differ and how to balance them
In short
Reactive maintenance repairs things once they fail or are reported; planned maintenance happens on a schedule before anything fails. Every estate needs a mix. The goal is to plan the work that heads off expensive or dangerous failures and to respond fast to everything else.
The FM Shortlist research team
Contents
- What planned maintenance is
- What reactive maintenance is
- Which approach suits which situation
- What each costs
- Changing the balance
- Maintenance based on condition and prediction
- Handling reactive work well
- Software that handles both
- How to measure the balance
- One system for planned and reactive work
- Common questions
- Read next
What planned maintenance is
Servicing, inspections and statutory checks done to a schedule set by calendar, usage or condition. It cuts breakdowns, evens out the workload and creates the records that prove compliance. For more, read PPM explained.
What reactive maintenance is
Repairs carried out once something fails or is reported: a broken light, a leak, a lift out of action. It is also known as breakdown or corrective maintenance. Speed counts most, from when a fault is noticed to when it is repaired. The reactive maintenance ranking covers this.
Which approach suits which situation
| Situation | Normally best covered by |
|---|---|
| Systems critical to safety: fire, gas, lifts, water | Statutory checks and planned maintenance |
| Costly plant where parts take a long time to arrive | Condition-based or planned maintenance |
| Low-cost, easily swapped items such as light fittings | Reactive maintenance |
| Faults raised by building users | Reactive maintenance backed by clear SLAs |
What each costs
The cost of planned maintenance is regular and visible: labour, contractor visits and parts on a schedule you can budget for. The saving is less obvious, since it is a breakdown that never occurs.
Reactive maintenance seems cheaper until something breaks. The repair is just one part of the bill: add the downtime, the premium for urgent contractor call-outs, lost trade in a hotel or shop, and at times damage elsewhere in the building, such as a burst pipe soaking the ceiling underneath.
Only by logging both types of work against each asset can you see what each truly costs. That is among the main things a maintenance management system (CMMS) is for.
Changing the balance
- Log every reactive job against an asset so that repeat faults come to light.
- Put assets that break down often onto a planned schedule.
- Fit sensor triggers to critical plant so jobs are raised ahead of failure.
- Track SLAs on reactive work so response times remain visible.
Maintenance based on condition and prediction
Maintenance triggered by condition sits between the two: a meter, a sensor reading or something found on inspection. Work is raised when the data shows it is needed, not on a fixed date.
A number of products state sensor triggers in their documentation, and the table below shows which. The HVAC maintenance ranking gives this the most weight, since heating and cooling plant is where it is most used.
Handling reactive work well
- <b>Keep reporting simple</b>: a QR code on the asset or a simple portal means faults arrive with a photo and the correct location.
- <b>Prioritise</b>: a flickering light and a leaking roof should not have the same SLA.
- <b>Monitor SLAs</b> for response and fix, for contractors as well as your own team.
- <b>Report back</b>: let whoever raised the fault know once it is fixed.
- <b>Log the cause</b>, so repeat faults come to light and can be moved onto a planned schedule.
Fault reporting, SLA tracking and the mobile app carry the weight in the reactive maintenance ranking.
Software that handles both
For the features that matter most to planned and reactive work, what each product states.
| Software | Helpdesk and request portal | SLA tracking | Mobile app | Planned maintenance (PPM) scheduling | IoT and sensor triggers | Rating |
|---|---|---|---|---|---|---|
| Infraspeak | Yes | Yes | Yes | Yes | Yes | 4.7 from 178 reviews |
| Planon | Yes | Yes | Yes | Yes | Yes | 4.3 from 16 reviews |
| Concerto | Yes | Yes | Yes | Yes | Yes | 4.5 from 4 reviews |
| Service Works Global | Yes | Yes | Yes | Yes | Partly | 5.0 from 1 review |
| MaintainX | Yes | Not confirmed | Yes | Yes | Yes | 4.8 from 3,136 reviews |
| Snapfix | Yes | Not confirmed | Yes | Yes | Yes | 4.7 from 63 reviews |
| Joblogic | Partly | Not confirmed | Yes | Yes | Not confirmed | 4.5 from 483 reviews |
Taken from each vendor's documentation, with the source for every cell on its review. Not stated means we searched and found nothing.
How to measure the balance
- <b>Ratio of planned to reactive</b>, by jobs or by hours, followed month by month.
- <b>Reactive jobs for each asset</b>, to identify assets that belong on a planned schedule.
- <b>Response and fix times</b> measured against your SLAs.
- <b>Planned tasks finished on time</b>, because a slipping schedule becomes reactive work later on.
These reports are standard in most CMMS software and CAFM systems. Ask to see them during the demo; there are more questions in our CAFM buyer's checklist.
One system for planned and reactive work
A CMMS software package or CAFM system handles both types of work from a single asset register. Set the reactive maintenance ranking beside the preventive maintenance ranking to see which products do best at each.
Common questions
Are reactive and corrective maintenance the same?
More or less. Corrective maintenance is the broader term and covers faults found on planned inspections; reactive normally means responding to a fault nobody planned for.
What ratio of planned to reactive maintenance should I aim for?
No single figure fits every estate. Follow your own ratio over time, and work to move frequent, expensive failures onto planned schedules.
Is reactive maintenance always a bad thing?
No. Fixing on failure is often the right call for low-cost, easily replaced items. The trouble comes when critical or costly assets fail without a plan.
What does run-to-failure mean?
Choosing on purpose to let an asset run until it breaks, normally because replacing it is quick and cheap. That is still a decision, and it should be logged as one.