UK compliance calendar for a retail unit
A shop unit with chilled display cases, air conditioning and a staff room, and no passenger lift.
Assets assumed: Fire risk assessment, Fire detection and alarm system, Emergency escape lighting, Fire doors, Hot and cold water systems, Fixed electrical installation, Portable electrical equipment, Air-conditioning systems, Equipment containing fluorinated greenhouse gases, Gas appliances, installation pipework and flues.
| Check | How often | Basis | Status | Source |
|---|---|---|---|---|
| Fire risk assessment Review the fire risk assessment | Regularly; no fixed interval set in law. Also whenever it may no longer be valid or there has been a significant change | Article 9 of the Regulatory Reform (Fire Safety) Order 2005, as amended by the Building Safety Act 2022. Regular review is a legal requirement, but no fixed interval is set; each assessment and review has to be recorded in full. | Law | The Regulatory Reform (Fire Safety) Order 2005, article 9 checked |
| Fire detection and alarm system Check control and indicating equipment for faults | Daily (at least every 24 hours) | Section 2.5 of the Home Office fire safety guide for offices and shops. This is guidance; under the Fire Safety Order the system must be maintained. | Official guidance | Fire safety risk assessment: offices and shops (Home Office guide, published 5 June 2006, last updated 12 September 2023, applies to England) checked |
| Fire detection and alarm system Weekly alarm test (operate a different manual call point each week) | Weekly | BS 5839-1 and section 2.5 of the Home Office fire safety guide recommend this. Test a different call point each week and note which one you used. | British Standard | Fire safety risk assessment: offices and shops (Home Office guide, published 5 June 2006, last updated 12 September 2023, applies to England) checked |
| Fire detection and alarm system Inspection and servicing by a competent person | About every 6 months (any time 5 to 7 months after the last visit) | BS 5839-1:2025 recommends this, as summarised by the Fire Industry Association. A visit falling anywhere from five to seven months after the previous one is acceptable. | British Standard | Fire Industry Association: Guide to the changes in BS 5839-1:2025 checked |
| Emergency escape lighting Visual check of central battery / central power supply indicators | Daily | The Home Office fire safety guide for offices and shops and the ICEL emergency lighting guide both recommend this. It covers central battery systems only, not self-contained fittings. | Official guidance | Fire safety risk assessment: offices and shops (Home Office guide, published 5 June 2006, last updated 12 September 2023, applies to England) checked |
| Emergency escape lighting Monthly functional test | Monthly | BS 5266-1 recommends this (as summarised in ICEL's lighting industry guide), as does the Home Office fire safety guide. It is not law in itself; under the Fire Safety Order, emergency lighting must be maintained. | British Standard | ICEL Emergency Lighting Guide (Lighting Industry Association) checked |
| Emergency escape lighting Annual full rated-duration test | Annually | BS 5266-1 (as summarised by ICEL) and the Home Office fire safety guide recommend this. Schedule the test for a quiet period, as the batteries take about a day to recharge. | British Standard | ICEL Emergency Lighting Guide (Lighting Industry Association) checked |
| Emergency escape lighting Photometric verification of the system | Initially, then at intervals not exceeding 5 years | Added in BS 5266-1:2025: at least every five years, confirm that the system still provides the light levels it was designed for. This is a recommendation in a British Standard, not law. | British Standard | NICEIC: BS 5266-1 Emergency lighting (summary of the 2025 revision) checked |
| Fire doors Workplaces: check fire doors, seals and self-closers work correctly | Monthly (recommended) | Maintenance checklist in the Home Office fire safety guide for offices and shops. This is guidance; under the Fire Safety Order fire doors must be maintained. | Official guidance | Fire safety risk assessment: offices and shops (Home Office guide, published 5 June 2006, last updated 12 September 2023, applies to England) checked |
| Fire doors Workplaces: test release and closing mechanisms of fire-resisting compartment doors and shutters | Six-monthly (recommended) | Maintenance checklist in the Home Office fire safety guide for offices and shops. This is guidance, and the work should be done by a competent person. | Official guidance | Fire safety risk assessment: offices and shops (Home Office guide, published 5 June 2006, last updated 12 September 2023, applies to England) checked |
| Hot and cold water systems (legionella control) Legionella risk assessment and its review | Regularly; no fixed interval set in law. Also whenever it may no longer be valid | HSE guidance on the legal duty to assess and control the risk from legionella. No annual or two-yearly review is set in law; review regularly and whenever anything changes. | Law | HSE: Legionella and landlords' responsibilities checked |
| Hot and cold water systems (legionella control) Sentinel outlet temperature checks, hot and cold (cold <20C after 2 min; hot >=50C within 1 min) | Monthly | HSE guidance on hot and cold water systems. Sentinel outlets are the taps closest to and furthest from each tank or cylinder. | Official guidance | HSE: Hot and cold water systems - things to consider checked |
| Hot and cold water systems (legionella control) Calorifier flow and return temperatures (outgoing >=60C) | Monthly | HSE guidance on hot and cold water systems. Stored hot water should be kept at 60°C or higher. | Official guidance | HSE: Hot and cold water systems - things to consider checked |
| Hot and cold water systems (legionella control) TMV hot inlet temperature (>=50C within 1 min) | Monthly | HSE guidance on hot and cold water systems, applying where thermostatic mixing valves are installed. | Official guidance | HSE: Hot and cold water systems - things to consider checked |
| Hot and cold water systems (legionella control) Cold water storage tank temperature at ball valve outlet (<20C) | Every 6 months | HSE guidance on hot and cold water systems. Stored cold water should be kept under 20°C. | Official guidance | HSE: Hot and cold water systems - things to consider checked |
| Hot and cold water systems (legionella control) Visual inspection and cleanliness check of cold water tanks and hot water cylinders | At least annually | Guidance from HSE on hot and cold water systems. | Official guidance | HSE: Hot and cold water systems - things to consider checked |
| Hot and cold water systems (legionella control) Flush infrequently used outlets | Weekly | HSE guidance on hot and cold water systems. Avoid creating spray when flushing. | Official guidance | HSE: Hot and cold water systems - things to consider checked |
| Hot and cold water systems (legionella control) Dismantle, clean and descale showerheads and hoses | Quarterly, or as the risk assessment decides | HSE guidance on hot and cold water systems. Your risk assessment may set another interval. | Official guidance | HSE: Hot and cold water systems - things to consider checked |
| Hot and cold water systems (legionella control) Check representative outlets on rotation | Rotational, so the whole system is covered (HSE page also says check annually for cold outlets) | HSE guidance on hot and cold water systems. Pick outlets so that, over time, every part of the system is covered. | Official guidance | HSE: Hot and cold water systems - things to consider checked |
| Fixed electrical installation (EICR) in workplaces Maintain the fixed installation; inspect and test it often enough to prevent danger | No interval set in law; the inspector recommends the next date | Regulation 4 of the Electricity at Work Regulations 1989. Electrical systems must by law be maintained to prevent danger, but no inspection interval is set. | Law | The Electricity at Work Regulations 1989, regulation 4 checked |
| Fixed electrical installation (EICR) in workplaces Periodic inspection and test (EICR) of commercial premises | At least every 5 years (recommended) | NICEIC recommends that business premises have an EICR at least every five years. This is a recommendation rather than law, and the inspector may set a shorter interval for your building. | Official guidance | NICEIC: Electrical Installation Condition Reports (EICRs) checked |
| Portable electrical equipment (PAT) Class I (earthed) e.g. kettles, irons, some floor cleaners: formal visual inspection | Every 6 months to 1 year (suggested starting interval); user checks before use | Suggested starting intervals for low-risk workplaces from HSE leaflet INDG236. The law sets no testing frequency; adjust it in light of what your checks show. | Official guidance | HSE INDG236(rev3): Maintaining portable electrical equipment in low-risk environments checked |
| Portable electrical equipment (PAT) Class I (earthed) equipment: combined inspection and test (PAT) | Every 1 to 2 years (suggested starting interval) | HSE leaflet INDG236. PAT is not mandatory; for earthed equipment in low-risk workplaces, HSE suggests this as a starting interval. | Official guidance | HSE INDG236(rev3): Maintaining portable electrical equipment in low-risk environments checked |
| Portable electrical equipment (PAT) Class II hand-held (e.g. some floor cleaners, kitchen equipment): formal visual inspection | Every 6 months to 1 year; no PAT needed | Suggested starting interval in HSE leaflet INDG236 for hand-held equipment with double insulation. | Official guidance | HSE INDG236(rev3): Maintaining portable electrical equipment in low-risk environments checked |
| Portable electrical equipment (PAT) Class II not hand-held, moved occasionally (fans, table lamps): formal visual inspection | Every 2 to 4 years; no PAT needed | Suggested starting interval in HSE leaflet INDG236 for double-insulated equipment that seldom moves. | Official guidance | HSE INDG236(rev3): Maintaining portable electrical equipment in low-risk environments checked |
| Portable electrical equipment (PAT) Desktop computers, VDUs, photocopiers (rarely moved): formal visual inspection | Every 2 to 4 years; PAT none if double insulated, otherwise up to 5 years | Suggested starting interval in HSE leaflet INDG236 for office IT equipment and copiers that are seldom moved. | Official guidance | HSE INDG236(rev3): Maintaining portable electrical equipment in low-risk environments checked |
| Portable electrical equipment (PAT) Extension leads, cables, plugs, battery chargers: formal visual inspection and combined test | Visual every 6 months to 4 years; test every 1 to 5 years, depending on the connected equipment | HSE leaflet INDG236. Set the interval to suit the equipment the lead is used with. | Official guidance | HSE INDG236(rev3): Maintaining portable electrical equipment in low-risk environments checked |
| Air-conditioning systems (TM44 inspection) Inspection of accessible parts of the system by an energy assessor | At regular intervals not exceeding 5 years | Regulation 18 of the Energy Performance of Buildings (England and Wales) Regulations 2012. Required by law for air-conditioning systems above 12 kW. | Law | The Energy Performance of Buildings (England and Wales) Regulations 2012, Part 4 checked |
| Equipment containing fluorinated greenhouse gases (refrigeration, air-conditioning, heat pumps, fire protection, switchgear) Leak check: 5 to <50 tonnes CO2e | At least every 12 months (24 months with a leak detection system) | Article 4 of the F-gas Regulation (as it applies in Great Britain). Required by law and done by a certified technician. | Law | Regulation (EU) No 517/2014 as retained in GB law, article 4 checked |
| Equipment containing fluorinated greenhouse gases (refrigeration, air-conditioning, heat pumps, fire protection, switchgear) Leak check: 50 to <500 tonnes CO2e | At least every 6 months (12 months with a leak detection system) | Article 4 of the F-gas Regulation (as it applies in Great Britain). Required by law and done by a certified technician. | Law | Regulation (EU) No 517/2014 as retained in GB law, article 4 checked |
| Equipment containing fluorinated greenhouse gases (refrigeration, air-conditioning, heat pumps, fire protection, switchgear) Leak check: 500 tonnes CO2e or more | At least every 3 months (6 months with a leak detection system) | Article 4 of the F-gas Regulation (as it applies in Great Britain). Equipment of this size also needs an automatic leak detection system, which must be checked every year. | Law | Regulation (EU) No 517/2014 as retained in GB law, article 4 checked |
| Equipment containing fluorinated greenhouse gases (refrigeration, air-conditioning, heat pumps, fire protection, switchgear) After a leak is found: repair as soon as possible and re-test | Re-test within 1 month of repair | Guidance on GOV.UK from the Environment Agency and Defra about the F-gas rules. Failing to repair leaks is against the law and can result in a civil penalty. | Law | GOV.UK: Checking F gas equipment for leaks (Environment Agency / Defra) checked |
| Gas appliances, installation pipework and flues Workplaces: maintain gas appliances, pipework and flues in a safe condition | No fixed legal frequency for workplaces | Regulation 35 of the Gas Safety (Installation and Use) Regulations 1998. Employers have to keep gas appliances, pipework and flues safe to use; for workplaces, the law sets no fixed check interval. | Law | The Gas Safety (Installation and Use) Regulations 1998, regulation 35 checked |
England unless stated. Where the law sets a duty without an interval, the row says so; a recommended frequency is the one an inspector or insurer will usually look for.